Inspection
1.

Disconnect the negative (-) battery terminal.

2.

Remove the crash pad lower panel.

(Refer to the BD group - "Crash Pad")

3.

Remove the PDM relay box (A) after loosening the nuts (2EA) and disconnecting the connector.

IGN2 Relay

Check for continuity between the terminals.

1.

There should be continuity between the No.1 in the B and No.2 in the B terminals when power and ground are connected to the No.3 in the A and No.4 terminals in the B terminals.

2.

There should be no continuity between the No.1 in the B and No.2 terminals in the B terminals when power is disconnected.

IGN1 Relay

Check for continuity between the terminals.

1.

There should be continuity between the No.7 in the A and No.8 in the A terminals when power and ground are connected to the No.3 in the A and No.10 terminals in the A terminals.

2.

There should be no continuity between the No.7 in the A and No.8 terminals in the A terminals when power is disconnected.

ACC Relays

Check for continuity between the terminals.

1.

There should be continuity between the No.7 in the A and No.6 in the A terminals when power and ground are connected to the No.1 in the A and No.3 terminals in the A terminals.

2.

There should be no continuity between the No.7 in the A and No.6 terminals in the A terminals when power is disconnected.